Daniel J Chambers. 700130336.

Major Project Development

Glazing detail. I don't want the widow frames standing out this detail will give me a 1cm exposed brass edge at the head of the glazing externally and a 1cm exposed edge at the foot of the window internally. I also like this detail because it allows me to have a flat sill with a hard edge, and a continuous wall line internally with maximum shadow line externally that emphisise the depth of the concrete walls. I have decided to base the form work, major grids, ceilings and floors on a primary and secondary Tatami Matts. Primary: 2400 x 1200. Secondary: 1200 x 600. So glazing panels will be 600 x 1200 with a silcone join between.

1 comment:

Unknown said...

MEDIUM quality blog. Most required tasks completed to a satisfactory level. Evidence of relevant investigation and comprehension of tasks.

Project Information

The Albury City Library Museum Project is the first in a multi-staged development. It will be one of Australias first fully intigrated regional Library Museum Complexes. The new Library Museum is a partnership between Albury City, NSW Ministry of the Arts and NSW State Library. Client: Albury City Architect: Ashton Raggatt McDougall Contractor: Zauner Construction pty ltd

Albury City Library Museum

Albury City Library Museum
Daniel J Chambers 700 130 336, 1 of 5, 4 March 2007

Albury City Library Museum

Albury City Library Museum
Daniel J Chambers, 2 of 5, 4 March 2007

Albury City Library Museum (floor beam & column detail)

Albury City Library Museum (floor beam & column detail)
Daniel J Chambers 700 130 336, 3 of 5, 4 March 2007.

Albury City Library Museum (detail)

Albury City Library Museum (detail)
Daniel J Chambers 700 130 336, 4 of 5, 4 March 2007.

Albury City Library Museum (roof beam detail)

Albury City Library Museum (roof beam detail)
Daniel J Chambers 700 130 336, 5 of 5, 4 march 2007.